The last plank in the first row may need to be cut.
Allure locking vinyl plank flooring installation instructions.
Allure plank and tile installation instructions.
Material needed for installation.
Install one row at a time clicking the ends together.
Gradually lower the plank down flat applying pressure inward and downward until the end joint closes insuring that the planks are perfectly aligned.
This is a floating floor that uses a tongue and groove locking system.
The ends of the planks have little locking strips that snap into place and secure the planks.
You ve never seen resilient flooring that looked as good and.
At least 48 hours prior to installation place the new vinyl plank flooring in the room for acclimation.
Gripstrip click lock and glue down.
Floor roller sharp shears for cutting around irregular objects and also a heat gun painters gun or hairdryer for reheating planks or replacing planks.
When using tongue and groove planks vinyl flooring installation should start in a lefthand corner with the tongue facing the wall.
During installation you can mix planks from different boxes to blend the dye lots patterns to create a more uniform appearance.
Position the first plank from the starting wall using inch spacers.
Measuring tape utility knife or vinyl cutter straight edge hand roller 75 to 100 lb.
Measure the distance between the wall and the surface of the last full plank.
The instructions provided with the vinyl planks were very clear and easy to follow.
Starting with the tongue side facing the wall these planks fit together with little effort.